ST. LOUIS – The Missouri Department of Transporation announced on Wednesday, Oct. 16, 2024, that the Stan Musial Veterans Memorial Bridge (I-70) is set to reopen to downtown St. Louis today after being closed for two days due to a fire at an abandoned building adjacent to the bridge.

The Illinois Department of Transportation (IDOT) announced the reopening in coordination with the Missouri Department of Transportation (MODOT) and the city of St. Louis, stating that the process will begin soon and be completed by the Wednesday evening rush hour.

Get The Latest News!

Don't miss our top stories and need-to-know news everyday in your inbox.

The Stan Musial Bridge was closed Monday evening, Oct. 14, 2024, after a significant fire broke out at a storage building in the 1800 block of North Broadway in St. Louis, directly next to the bridge.

Article continues after sponsor message

More than 40 firefighters responded to the scene, where the blaze was classified as a second-alarm fire. A battalion chief on site described the situation as a “nightmare,” emphasizing the risks posed by the fire's proximity to the interstate.

The closure began around 6 p.m. Monday, Oct. 16, 2024, prompted by concerns that the burning structure could collapse onto the highway. Fire crews worked diligently to contain the flames and ensure public safety during the incident.

IDOT and MODOT advised motorists to exercise caution as traffic patterns stabilize following the reopening of the bridge.

 

More like this:

Fatal Eads Bridge Crash Closes Both Directions Tuesday Morning, Oct. 6, 2026
Oct 6, 2026
St. Louis Man Accused Of Metro East Massage Parlor Arsons
Oct 21, 2026
Fatal Fuji Super Spa Blaze Draws Federal Investigators
Oct 21, 2026
Man Charged With Murder in East St. Louis Shooting
Oct 14, 2026
Warehouse Transformer Fire Sends Crews to Alton Cut Street
4 days ago